DB Schenker Rail operates first European sized freight train over High Speed 1

Listen to this article

The project to introduce regular European sized freight trains on High Speed 1 has achieved a major breakthrough following the successful operation by DB Schenker Rail during the early hours of Saturday 23 July 2011 of the first European sized freight train on the route.

The significantly larger haulage capacity available, with an internal height of three meters, from the curtain sided swap bodies moved on this train can only be utilised on the High Speed 1 route from the Channel Tunnel to London, as it is the only European sized rail route in the UK.

Two wagons from Spanish logistics operator Transfesa, part of DB Schenker Rail, and four European sized swap bodies were successfully transported over High Speed 1 on Saturday 23 July from Dollands Moor near Folkestone to a rail terminal in East London in a fault free operation.

DB Schenker Rail plans to follow this initial operation with the first full train of European sized swap bodies, with regular services being introduced thereafter.

In doing so, DB Schenker Rail will connect the UK via the High Speed 1 route to the rest of its pan European rail freight network, opening a new market for customers to export and import goods more efficiently using larger wagons.

Alain Thauvette, Chief Executive of DB Schenker Rail (UK) Ltd, said:

“This rail freight service is a historic milestone for European rail freight.

“For the first time ever, the larger swap bodies as used as standard across mainland Europe were transported to London in a fault free operation.

“The UK is now connected to the larger freight railway used across Europe.”

Mr Thauvette continued: “We have been conducting trials over five months on the High Speed 1 rail route, arriving at this major milestone.

“We will now deliver larger freight trains travelling from anywhere across Europe on the DB Schenker Rail pan-European network to London. This will increase modal shift between road to rail across Europe.”

The work to introduce rail freight services onto High Speed 1 has been supported by the European Commission’s Marco Polo programme.

2 COMMENTS

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Rail News

Petards Rail boosts team with new appointment

Intelligent train technology provider Petards Rail has appointed Calvin Fahey to the role of procurement manager. Calvin is Level 3...

More like this...