Mechan installs record jack system for Alstom

Listen to this article

Sheffield-based rail maintenance equipment specialist, Mechan, has installed the largest single system of lifting jacks in the UK at the Alstom Transport Traincare Centre in Longsight near Manchester.

The 44-jack system, which is the biggest ever produced by Mechan, will be used to service the new 11 car Alstom-built Pendolino trains being introduced on the West Coast Mainline.

Mechan saw off competition from Europe and China to secure the contract, which involved designing a completely new version of its Microlink jack control system, to accommodate such a large number of jacks.

The firm also had to manufacture a taller version of its standard jack to enable the system to operate within the practical constraints of the depot.

Richard Carr, Mechan’s managing director, said:

“This project marks a significant step forward for Microlink and consequentially the application of our jacks.

“It has taken seven months to develop software that will lift such a large network without losing the flexibility and synchronicity for which the system is renowned and we are very pleased with the results.”

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Rail News

ORR review leads to 50% reduction in maximum fees for ticket refunds

New rules will mean that from 2 April the maximum fee that train operators and ticket retailers can charge...

More like this...