Global Rail News

  • Home
  • Featured Articles
    • Rail News
  • Infrastructure & Rolling Stock
    • Infrastructure
    • Project News
    • Stations
    • Rolling Stock and Components
    • Technology
    • S & T
  • Industry News
    • Train Operating Companies
    • Business
    • Franchise News
    • Events
    • People
    • HSEQ
    • Heritage
  • Passenger & Freight
    • High Speed Rail
    • Light Rail
    • Metro and Subway
    • Rail Freight
  • Subscribe
  • About
  • Contact
  • Advertise

Indian Railways’ Mumbai elevated rail corridor on track

3
  • by admin
  • in Featured Indian Rail News · Rail News
  • — 16 Aug, 2012

Indian Railways is to introduce a new air-conditioned suburban train service in Mumbai to boost capacity on the over-exhausted western suburban railway service.

The new $4 billion 63.27 km elevated rail corridor linking Oval Maidan, South Mumbai, and Virar – the northern most railway station of Mumbai Suburban Railway – will have two-track corridor along the existing Churchgate-Virar section, which is operated by the Western Railway (WR) Zone of Indian Railways.

Out of the 62.27 km corridor, 42.72 km route will be on elevated track, 8.04 km will be underground and the remaining 12.52 at grade (ground level).

It will have with 26 stations, which have been designed for trains to run at an optimum speed of 100 kmph.

Out of 26 stations, five stations would be underground, 19 stations will be elevated and two stations will be at grade. In the underground sections, the rail level will be around 15 metres below ground level.

The project has received personal attention of the prime minister office (PMO), who said: “Mumbai elevated rail corridor project which is the most advanced stage. The technical feasibility study has already been conducted and concessionaire shall be finalized by March 15, 2013.”

“The project will be implemented on a public private partnership (PPP) mode on Design, Build, Finance, Operate and Transfer (DBFOT) basis and the draft state support agreement has been agreed to between the government of Maharashtra and the Railways Ministry,” a Western Railway official said.

As per Indian Railways estimate, around 1.7 million passengers would use the corridor, when it opens 2019-20. It plans to run 19 hours services daily from 5am till late night and expects the trains will carry 90,000 people.

The Ministry of Railways has constituted a project steering group to monitor the implementation of the project including finalising the documentation, overseeing the bidding process, and awarding the contract in a timely manner.

Share:

  • Email
  • Twitter
  • LinkedIn
  • Facebook
  • Google +1
  • Pinterest
  • Print
  • Previous story Balfour Beatty on target despite tough European rail market
  • Next story High speed to Florence

Recommended for you

  • Tibbett Logistics takes delivery of first intermodal rail wagons 1 Dec, 2011
  • “Lucky escape” for driver after vandals place concrete lids on rail line 1 Aug, 2012
  • Masabi secures $4 million investment to drive expansion 3 Nov, 2011
  • Brits ‘favour car hire over public transport’ when holidaying abroad 30 Sep, 2011
  • Pingback: Indian Railways is launching the Mumbai elevated rail corridor project – Research and opinions on Indian Industries hot for investing | Research on India

  • Pingback: インド・ムンバイに延長63キロの通勤新線計画 | railplanet

  • Pingback: Indian Railways is launching the Mumbai elevated rail corridor project – Research and opinions on Indian Industries hot for investing | Research on India

  • Trending topic: RAILTEX 2013

    • Railtex 2013 gallery

    • What to see at Railtex 2013

    • Suppliers prepare to welcome Railtex visitors

  • Latest, Popular, Comments

    • Recent Posts
    • Most Popular
    • Comments
    • HitachiSuperExpressTrain31IEP win for Nomad DigitalMay 1, 2013
    • therailengineer-iPad720Rail Engineer App unveiled at RailtexMay 1, 2013
    • NWR_BNS_CAM6_Moor_street_linkHalf time at New StreetMay 1, 2013
    • Photo: NET.Nottingham tram bridge slide nears completionApril 30, 2013
    • London ghost station project enters new phaseApril 9, 2013
    • Old-footbridge-demolition1New platforms open at Reading stationApril 2, 2013
    • HS2 rethinks Euston demolitionApril 19, 2013
    • East Coast most efficiently run franchiseApril 18, 2013
    • This England Magazine and HS2 PETITION – Judith H. | on:HS2 rethinks Euston demolition
    • Sochi railway taking shape ahead of 2014 Games | Global Rail News on:First Lastochka services set to begin
    • HS2 backed by High Court ruling | Global Rail News on:HS2: Second phase route announced
    • Tim on:Members confirmed for government franchise board
  • Over on Facebook

  • Home
  • Featured Indian Rail News
  • Indian Railways’ Mumbai elevated rail corridor on track
  • Global Rail News
  • RailStaff
  • the rail engineer
  • RailwayPeople.com
  • The RailStaff Awards
  • Rail HR, Rec & Skills Awards
  • Rail Safety Summit
  • Rail Media

© 2013. Rail Media. All rights reserved.

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.