6.6 C
London
Friday, May 10, 2024

Malcolm Dobell BTech CEng FIMechE

Cleaning the rail head

Rail Engineer has often written about the problems of low adhesion caused by, inter alia, leaf debris rolled into the railhead. As a reminder, dry leaf debris can cause wrong-side track circuit failures and, when wet, can lead to...

A little sand in the right place works wonders

Part 4, Passenger Service In this series so far, Rail Engineer has reported on the tests of Double Variable Rate Sanders (DVRS - a new acronym is born) on a Class 387 Electrostar at the RIDC Melton (issue 157, November...

Bi-Mode Good, Tri-Mode Better

A previous article outlined plans for bi-mode fleets on UK railways. This article briefly described Porterbrook Leasing’s Class 319 Flex conversions. A total of 32 units are currently on order, more than half of which will be the UK’s first tri-mode trains (AC, DC and diesel).

About

3 POSTS
0 COMMENTS

Latest News

Keltbray has been Awarded Two Prestigious CP7 Infrastructure Services Contracts with Network Rail

Keltbray today announces that it has been awarded two long term positions on Network Rail’s Control Period 7 (CP7)...